Thermal Remediation Projects

More than 25 ERH and TCH projects delivered since 2010 — under operating factories, beside schools, and on brownfields now redeveloped. A selection below; detailed case studies available on request.

ERHChlorinated solventsIndustrial

TCE/PCE Source Zone — Operating Manufacturing Plant

ERH treatment of a chlorinated solvent source zone beneath an active industrial facility. Electrodes installed through the production floor; the plant never stopped operating. Closure criteria achieved.

ThermalBenzene & TPHMunicipal

Fuel-Impacted Soil — Municipal School Site

Thermal treatment of benzene and TPH at a highly sensitive municipal school site, with strict vapor and noise controls. Presented at the Battelle Conference 2026.

ERHVOCsBrownfield

Brownfield Redevelopment — São Paulo

Fast-track ERH source removal on a former industrial property in a dense urban area, unlocking residential redevelopment on schedule for the developer.

ERHChlorinated solventsMetalworking

Solvent Release — Metal Manufacturing Facility

ERH remediation of degreasing solvents in low-permeability soils at a metalworking plant, from pre-design characterization through confirmation sampling.

ERHVOCsAgrochemical

VOC Source Zone — Agrochemical Facility

In situ thermal treatment of volatile organics at an operating agrochemical site, integrated with the facility's existing environmental management program.

Bench-scaleVOCsR&D

Bench-Scale ERH Evaluation for VOC Remediation

Laboratory validation of ERH performance in site-specific soils prior to full-scale design — de-risking the remedy before mobilization. Presented at Battelle 2026.

Want the Full Case Studies?

Request detailed project summaries — geology, wellfield design, energy delivered and closure data.